This existing, 105-foot-long bridge connects a utility building to a hangar at Miami International Airport, with multiple rack supports for the utilities supported by this bridge. BNI performed a structural evaluation to determine the feasibility of reinforcing the existing structure due to advanced corrosion. The bridge was completely re-furbished and brought up to code.