AVIATION

Skyport

AVIATION

Elevated heliport facility with two helipads connected to Skyride system. Miami International Airport’s Skyport Terminal was programmed as the first stop in a network of heliports collectively operating as a regional commuter helicopter system serving Dade, Broward, Monroe and Palm Beach Counties. Paired with the Skyride Moving Sidewalk Bridge System, the Skyport/Skyride Project has become the premier airport inter-change among multiple modes of ground transportation, commuter air service and airline passenger circulation.

MIA has extremely limited land resources, and therefore its expansion opportunities are virtually limited to vertical stacking and overlay concepts. The 4,000 SF heliport terminal is comprised of an air conditioned check-in/ arrivals-departure lounge and an open-air breezeway. The breezeway is linked to an upper level vestibule and the landing pad via an open stair, escalator, and a baggage/passenger lift. The arrivals/departure lounge is accessible from Garage Level 7 approximately 65’ above grade. The lounge can also be accessed from two hydraulic elevators which link the Skyport with the Terminal Wide Moving Sidewalk System.

LOCATION

Miami International Airport

CATEGORY

Aviation

ARCHITECT

MC Harry & Associates

CONTRACTOR

Darin & Armstrong, Inc.

  • YEAR :
  • LOCATION : Miami International Airport
  • CATEGORY : Aviation
  • CREATIVE DIRECTOR :
  • VISUALIZATION :
  • ARCHITECT : MC Harry & Associates
  • CONTRACTOR : Darin & Armstrong, Inc.
  • EOR :
3062