Boeing Assembly Plant Peer Review

A 1.2 million SF assembly plant for the Boeing Dreamliner Project, located in a moderately active seismic area. It features a 1000 feet long by 460 feet wide unobstructed floor space. The building is supported by steel braced frames and long span steel trusses. The project was on an aggressive 24 month schedule from ground breaking to topping out. The project utilized around 15,000 tons of structural steel and 1 million cubic feet of concrete.

A comprehensive peer review was conducted by creating independent structural analysis models to verify the current design.

AWARDS
Associated Builders & Contractors
- National Project of the Year
ABC Eagle Award
- Excellence in Construction: Industrial Projects Over
$50 Million
ENR Southeast Magazine
- Best Industrial/Manufacturing Project, 2012
Boeing Performance Excellence Award, 2011
- BIM Experience Award

LOCATION

Charleston, South Carolina

ARCHITECT

BRPH

EOR

CMC Cary Engineers

SHARE PROJECT
  • YEAR :
  • LOCATION : Charleston, South Carolina
  • CATEGORY :
  • CREATIVE DIRECTOR :
  • VISUALIZATION :
  • ARCHITECT : BRPH
  • CONTRACTOR :
  • EOR : CMC Cary Engineers
boeing 2
027080510 cropped
6279